v4.5 [Mar 29, 2015]
Enhancement: Both Activity Codes and WBS are imported from XER files instead of just one or the other.
Enhancement: Opening a project is now faster and uses less memory.
Fixed: Sporadic crash when changing Page Layout or Page Setup from within the Print Preview screen.
Fixed: Properly draw timescale on multipage width printouts.
Fixed: A problem that prevented Phoenix from staying activated in some rare situations.
Fixed: Ignore empty Activity Code values.
Fixed: Percents in User Defined Fields were displayed as 100 times larger than they should be in the columns.
Fixed: Rare crashes that could occur with schedules imported from XER files.
Fixed: WBS assignments from P3/Suretrak imports now use the full WBS chain rather than just the final WBS node.
Fixed: Internet Activations can still occur even if an ISP has amended the HTTP response from the Activation Server in-flight (very rare).
Fixed: Application logs now always use the process name in the filename.
Fixed: Better logging of project save failures.
Fixed: Better logging of activation failures.
Fixed: Recreate activation data if a problem is detected.
Fixed: Better handle calendars with no name or duplicate names during P3/Suretrak import.
Fixed: Ignore relationships to non-existent activities in MPX and MSXML imports.
Fixed (Mac OS X only): Page Setup and Page Layout now work as expected from the Print Preview.